Distrito Escolar Unificado de Beaumont- Ampliación de la Escuela Secundaria de Beaumont

Company: Silver Creek Modular
Location: Beaumont, CA, USA
Gross Size of Project: 59, 722 Square Feet
Days to Complete: 526

Criterios de adjudicación

Excelencia arquitectónica

A design assist project approach was utilized on this project to allow the design architect and the modular building design team to collaborate on design considerations during the conceptual phase of the project which ensured that the modular construction systems selected would support the design intent. The project consists of two separate modular buildings which are each approximately 30,000 GSF. When combined the buildings contains 30 standard classrooms, 4 science laboratories, 2 medical training classrooms, 2 robotics classrooms, 2 multipurpose/collaboration
spaces, a full administrative wing and support spaces. The buildings’ exterior features multicolored stucco finishes, perforated aluminum screen walls and large glazing system. The buildings’ interior features abundant natural light in every educational space, custom wall graphics and custom wood paneling. The completed project reflects the coordinated efforts of all team members to provide a design focused experience.

Innovación técnica y sostenibilidad

To meet the project requirements a series of project specific module designs were utilized. The 12’-0” wide modules varied in length up to 48’-0”and the heights varied up to 14’-10”. The buildings feature 26’ tall breezeways at several locations which use specialized modules without a diaphragm at the 2nd level to create the open volume. A light weight concrete floor system was poured the in the factory for all modules. High efficiency LED lights with occupancy sensing controls and automatic daylighting
controls were used in all spaces. Dimming controls were provided in all classrooms to allow the teachers to adjust the light levels for specific learning exercises. Wall assemblies separating classrooms and adjacent spaces were designed to provide acoustic separation. Low-VOC materials were used throughout the project to provide a healthy learning environment. High efficiency VRF space conditioning systems were utilized with a dedicated outside air ventilation system.

Rentabilidad

El propietario del proyecto reconoció desde el principio de su proceso de planificación que la construcción modular era el método de construcción más rentable para su proyecto de ampliación del campus. Al utilizar la construcción fuera de las instalaciones, también pudieron obtener importantes ventajas en cuanto a plazos en comparación con los métodos de construcción tradicionales. Durante el proceso de diseño, los espacios interiores se planificaron cuidadosamente para maximizar el trabajo que podía realizarse en la fábrica siempre que fuera posible. En la medida de lo posible, los aseos se diseñaron y ubicaron de forma que estuvieran completamente dentro de un módulo para que pudieran completarse en la fábrica.

Ver más ganadores de los Premios de Distinción

Para ver todos nuestros galardonados actuales, visite nuestra página principal de Premios.